From: the n8n review §4 (two asks), the graph brief §5 (two asks), Lab 06 (two proposals not yet on the list). Size: two hours. Touches: site/lab-abp-requests.html, an edition via render-lab-pdfs.mjs, site/lab-editions.json (append).
The task
Lab 03 is the open request list against abp.sgit.ai, published rather than emailed. Add:
- A barrier per path rather than per row. The n8n measurement: the same operation
setting-barred through one access path and unbarred through another, on the same account, in the same session. Propose the
pathsshape from T02. - A word for a gate that is real but broad. The write-up called the API key a setting;
the enforcer test says the key is the grant. The four barriers cannot say the difference. Record the disagreement, propose nothing the model site has not been asked, and ask.
- Metrics and outward links on the 23 primitives, or a sanctioned extension namespace so a
policy can carry them without forking the grammar (T03).
- Lab 06's two proposals: the barrier's companion fields and the six composition rules,
which Lab 06 states and the register says are not yet on the list.
Constraints
- The page's existing entries and their numbering stay as they are; new requests are appended
with a date. A Lab page is current thinking; the editions keep the earlier state.
- Each ask cites where it came from on this site (the vault, the brief, the Lab entry).
- Cut an edition and note what separates it from the last.
Done means
- Four new requests on the page, dated, sourced; edition cut and registered; the brief register
entry for D6 (Lab 06) updates its
not_doneto reflect that the proposals are now listed.